Q-2, r. 35.2 - Water Withdrawal and Protection Regulation

Full text
66. In addition to the prohibition provided for in section 32, the construction of a drilling site to operate an underground reservoir is prohibited in the outer protection zone for category 1 or 2 groundwater withdrawals.
O.C. 696-2014, s. 66; S.Q. 2022, c. 10, s. 115.
66. In addition to the prohibition provided for in section 32, the construction of a drilling site to explore for or produce petroleum, natural gas or brine, or to explore for or operate an underground reservoir, and the performance of a stratigraphic survey, is prohibited in the outer protection zone for category 1 or 2 groundwater withdrawals.
O.C. 696-2014, s. 66.